{"id":7691,"date":"2023-04-05T12:36:24","date_gmt":"2023-04-05T17:36:24","guid":{"rendered":"http:\/\/www.silverbay.com\/?page_id=7691"},"modified":"2024-06-17T12:33:24","modified_gmt":"2024-06-17T17:33:24","slug":"east-lake-view-drive-black-beach-park-improvements","status":"publish","type":"page","link":"https:\/\/www.silverbay.com\/?page_id=7691","title":{"rendered":"East Lake View Drive\/Black Beach Park Improvements"},"content":{"rendered":"\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/04\/Screenshot-2023-03-29-142152-1.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"524\" src=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/04\/Screenshot-2023-03-29-142152-1-1024x524.jpg\" alt=\"\" class=\"wp-image-7681\" srcset=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/04\/Screenshot-2023-03-29-142152-1-1024x524.jpg 1024w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/04\/Screenshot-2023-03-29-142152-1-300x153.jpg 300w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/04\/Screenshot-2023-03-29-142152-1-768x393.jpg 768w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/04\/Screenshot-2023-03-29-142152-1.jpg 1527w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<h2 class=\"wp-block-heading has-text-color\" style=\"color:#007aa5\">Project Summary<\/h2>\n\n\n\n<p>EAST LAKEVIEW DRIVE \u2013THE CITY HAS OBTAINED $1,841,800 IN GRANT FUNDING THROUGH MN DNR STATE PARK ROAD ACCOUNT, MNDOT LOCAL ROAD IMPROVEMENT PROGRAM, AND IRRRB FOR THE NEW ROAD IMPROVEMENTS LEADING TO BLACK BEACH. FINAL ENGINEERING IS NEARING COMPLETION WITH REVIEW BY LAKE COUNTY AND THE STATE OF MN. BIDDING IS EXPECTED TO BE DONE SOON AND CONSTRUCTION SHOULD START IN THE SUMMER OF 2023.<\/p>\n\n\n\n<p>BLACK BEACH PARK IMPROVEMENTS-THE CITY HAS RECEIVED ADDITIONAL LEASED LAND FROM NORTHSHORE MINING TO EXPAND PARKING, TRAILS, AND PRIMITIVE CAMPING SITES AT BLACK BEACH PARK. THIS IS BEING DESIGNED IN CONJUNCTION WITH THE EAST LAKEVIEW DRIVE ROAD IMPROVEMENT PROJECT. ONCE THE DESIGNS ARE SATISFACTORY TO THE STATE, THEY WILL BE PROVIDED TO NORTHSHORE MINING FOR THEIR FINAL APPROVAL. THE MAJORITY OF THE FUNDING FOR EAST LAKEVIEW DRIVE IMPROVEMENTS HAS BEEN SECURED, BUT THE FUNDING FOR THE PARKING LOTS AND TRAILS ARE BEING SOUGHT.<\/p>\n\n\n\n<p>Updated: 4\/5\/23<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-text-color\" style=\"color:#007aa5\">Project Updates<\/h2>\n\n\n\n<p><strong>Photo Update 6\/17\/24<\/strong><\/p>\n\n\n\n<p>The road is open again.  Paving has started.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><a href=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/06\/black-beach-ortho-map-june-14th-2024.png\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"535\" src=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/06\/black-beach-ortho-map-june-14th-2024-1024x535.png\" alt=\"\" class=\"wp-image-9087\" style=\"width:1379px;height:auto\" srcset=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/06\/black-beach-ortho-map-june-14th-2024-1024x535.png 1024w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/06\/black-beach-ortho-map-june-14th-2024-300x157.png 300w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/06\/black-beach-ortho-map-june-14th-2024-768x401.png 768w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/06\/black-beach-ortho-map-june-14th-2024-1536x803.png 1536w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/06\/black-beach-ortho-map-june-14th-2024.png 1596w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><a href=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/06\/black-beach-road-const-June-14th-2024-progress-photo-3-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/06\/black-beach-road-const-June-14th-2024-progress-photo-3-1024x683.jpg\" alt=\"\" class=\"wp-image-9086\" style=\"width:1378px;height:auto\" srcset=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/06\/black-beach-road-const-June-14th-2024-progress-photo-3-1024x683.jpg 1024w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/06\/black-beach-road-const-June-14th-2024-progress-photo-3-300x200.jpg 300w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/06\/black-beach-road-const-June-14th-2024-progress-photo-3-768x512.jpg 768w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/06\/black-beach-road-const-June-14th-2024-progress-photo-3-1536x1024.jpg 1536w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/06\/black-beach-road-const-June-14th-2024-progress-photo-3-2048x1365.jpg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\"><br>Photo Credit: Phil Huston<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><a href=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/06\/black-beach-road-const-update-photo-june-14th-2024-4-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/06\/black-beach-road-const-update-photo-june-14th-2024-4-1024x683.jpg\" alt=\"\" class=\"wp-image-9085\" style=\"width:1378px;height:auto\" srcset=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/06\/black-beach-road-const-update-photo-june-14th-2024-4-1024x683.jpg 1024w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/06\/black-beach-road-const-update-photo-june-14th-2024-4-300x200.jpg 300w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/06\/black-beach-road-const-update-photo-june-14th-2024-4-768x512.jpg 768w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/06\/black-beach-road-const-update-photo-june-14th-2024-4-1536x1024.jpg 1536w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/06\/black-beach-road-const-update-photo-june-14th-2024-4-2048x1365.jpg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Photo Credit: Phil Huston<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">Notice &#8211; East Lakeview Drive will be closed\u00a0between 7:00 am Monday, June 10<sup>th<\/sup>\u00a0to 7:00 pm Thursday, June 13<sup>th<\/sup><\/mark><\/h2>\n\n\n\n<p><strong>Photo Updates for June 5, 2024<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><a href=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/06\/black-beach-road-const-update-photo-June-5th-2024-1-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/06\/black-beach-road-const-update-photo-June-5th-2024-1-1024x683.jpg\" alt=\"\" class=\"wp-image-9049\" style=\"width:1154px;height:auto\" srcset=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/06\/black-beach-road-const-update-photo-June-5th-2024-1-1024x683.jpg 1024w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/06\/black-beach-road-const-update-photo-June-5th-2024-1-300x200.jpg 300w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/06\/black-beach-road-const-update-photo-June-5th-2024-1-768x512.jpg 768w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/06\/black-beach-road-const-update-photo-June-5th-2024-1-1536x1024.jpg 1536w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/06\/black-beach-road-const-update-photo-June-5th-2024-1-2048x1365.jpg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Photo credit: Phil Huston<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><a href=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/06\/black-beach-road-const-Orthomap-progress-update-June-5th-2024.png\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"534\" src=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/06\/black-beach-road-const-Orthomap-progress-update-June-5th-2024-1024x534.png\" alt=\"\" class=\"wp-image-9050\" style=\"width:1154px;height:auto\" srcset=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/06\/black-beach-road-const-Orthomap-progress-update-June-5th-2024-1024x534.png 1024w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/06\/black-beach-road-const-Orthomap-progress-update-June-5th-2024-300x156.png 300w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/06\/black-beach-road-const-Orthomap-progress-update-June-5th-2024-768x400.png 768w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/06\/black-beach-road-const-Orthomap-progress-update-June-5th-2024-1536x801.png 1536w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/06\/black-beach-road-const-Orthomap-progress-update-June-5th-2024.png 1594w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large is-resized\"><a href=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/06\/black-beach-road-const-June-5th-2024-progress-photo-update-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/06\/black-beach-road-const-June-5th-2024-progress-photo-update-1024x683.jpg\" alt=\"\" class=\"wp-image-9051\" style=\"width:1025px;height:auto\" srcset=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/06\/black-beach-road-const-June-5th-2024-progress-photo-update-1024x683.jpg 1024w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/06\/black-beach-road-const-June-5th-2024-progress-photo-update-300x200.jpg 300w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/06\/black-beach-road-const-June-5th-2024-progress-photo-update-768x512.jpg 768w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/06\/black-beach-road-const-June-5th-2024-progress-photo-update-1536x1024.jpg 1536w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/06\/black-beach-road-const-June-5th-2024-progress-photo-update-2048x1365.jpg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Photo Credit: Phil Huston<\/figcaption><\/figure><\/div>\n\n\n<p><strong>Photo Updates for May 31, 2024<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><a href=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/05\/black-beach-road-construction-2-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/05\/black-beach-road-construction-2-1024x683.jpg\" alt=\"\" class=\"wp-image-9017\" style=\"width:1378px;height:auto\" srcset=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/05\/black-beach-road-construction-2-1024x683.jpg 1024w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/05\/black-beach-road-construction-2-300x200.jpg 300w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/05\/black-beach-road-construction-2-768x512.jpg 768w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/05\/black-beach-road-construction-2-1536x1024.jpg 1536w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/05\/black-beach-road-construction-2-2048x1365.jpg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Photo credit: Phil Huston<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/05\/black-beach-road-const-May-30th-2024-progress-update-3-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/05\/black-beach-road-const-May-30th-2024-progress-update-3-1024x683.jpg\" alt=\"\" class=\"wp-image-9018\" srcset=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/05\/black-beach-road-const-May-30th-2024-progress-update-3-1024x683.jpg 1024w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/05\/black-beach-road-const-May-30th-2024-progress-update-3-300x200.jpg 300w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/05\/black-beach-road-const-May-30th-2024-progress-update-3-768x512.jpg 768w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/05\/black-beach-road-const-May-30th-2024-progress-update-3-1536x1024.jpg 1536w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/05\/black-beach-road-const-May-30th-2024-progress-update-3-2048x1365.jpg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Photo Credit: Phil Huston<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/05\/black-beach-road-construction-2-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/05\/black-beach-road-construction-2-1024x683.jpg\" alt=\"\" class=\"wp-image-9017\" srcset=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/05\/black-beach-road-construction-2-1024x683.jpg 1024w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/05\/black-beach-road-construction-2-300x200.jpg 300w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/05\/black-beach-road-construction-2-768x512.jpg 768w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/05\/black-beach-road-construction-2-1536x1024.jpg 1536w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/05\/black-beach-road-construction-2-2048x1365.jpg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Photo Credit of Phil Huston<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/05\/black-beach-road-const-May-30th-2024-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/05\/black-beach-road-const-May-30th-2024-1024x683.jpg\" alt=\"\" class=\"wp-image-9021\" srcset=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/05\/black-beach-road-const-May-30th-2024-1024x683.jpg 1024w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/05\/black-beach-road-const-May-30th-2024-300x200.jpg 300w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/05\/black-beach-road-const-May-30th-2024-768x512.jpg 768w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/05\/black-beach-road-const-May-30th-2024-1536x1024.jpg 1536w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/05\/black-beach-road-const-May-30th-2024-2048x1365.jpg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Photo Credit: Phil Huston<\/figcaption><\/figure>\n\n\n\n<p><span data-fontsize=\"18px\" style=\"font-size: 18px;\" class=\"vk_inline-font-size\"><strong>Spring 2024<\/strong><\/span><\/p>\n\n\n\n<p>Work has resume on the road.  Here are the latest images from the project taken on May 15, 2024<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/05\/black-beach-road-const-progress-photo-update-May-15th-2024-1-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/05\/black-beach-road-const-progress-photo-update-May-15th-2024-1-1024x683.jpg\" alt=\"\" class=\"wp-image-8957\" srcset=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/05\/black-beach-road-const-progress-photo-update-May-15th-2024-1-1024x683.jpg 1024w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/05\/black-beach-road-const-progress-photo-update-May-15th-2024-1-300x200.jpg 300w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/05\/black-beach-road-const-progress-photo-update-May-15th-2024-1-768x512.jpg 768w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/05\/black-beach-road-const-progress-photo-update-May-15th-2024-1-1536x1024.jpg 1536w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/05\/black-beach-road-const-progress-photo-update-May-15th-2024-1-2048x1365.jpg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Photo credit: Phil Huston<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><a href=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/05\/black-beach-road-const-progress-photo-update-May-15th-2024-1-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/05\/black-beach-road-const-progress-photo-update-May-15th-2024-1-1024x683.jpg\" alt=\"\" class=\"wp-image-8957\" style=\"width:1378px;height:auto\" srcset=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/05\/black-beach-road-const-progress-photo-update-May-15th-2024-1-1024x683.jpg 1024w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/05\/black-beach-road-const-progress-photo-update-May-15th-2024-1-300x200.jpg 300w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/05\/black-beach-road-const-progress-photo-update-May-15th-2024-1-768x512.jpg 768w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/05\/black-beach-road-const-progress-photo-update-May-15th-2024-1-1536x1024.jpg 1536w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/05\/black-beach-road-const-progress-photo-update-May-15th-2024-1-2048x1365.jpg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Photo Credit: Phil Huston<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><a href=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/05\/black-beach-road-const-update-ortho-map-May-15th-2024.png\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"541\" src=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/05\/black-beach-road-const-update-ortho-map-May-15th-2024-1024x541.png\" alt=\"\" class=\"wp-image-8958\" style=\"width:1378px;height:auto\" srcset=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/05\/black-beach-road-const-update-ortho-map-May-15th-2024-1024x541.png 1024w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/05\/black-beach-road-const-update-ortho-map-May-15th-2024-300x159.png 300w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/05\/black-beach-road-const-update-ortho-map-May-15th-2024-768x406.png 768w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/05\/black-beach-road-const-update-ortho-map-May-15th-2024-1536x812.png 1536w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2024\/05\/black-beach-road-const-update-ortho-map-May-15th-2024.png 1587w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>October 30, 2023 &#8211; The work on the improvements to East Lakeview Drive are underway.  We will occasionally post photo updates to this website.  These photos are courtesy of Phil Huston and were taken 10\/23&amp; 28\/23.  The NEWEST photo is from November 2<\/p>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-layout-1 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p><strong>Update as of December 1, 2023<\/strong><\/p>\n\n\n\n<p>Here is a picture taken on December 1st.  The construction is halted for the season.<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/12\/Screenshot-black-beach-road-const-Dec-1st-2023-final-progress-update-for-season.png\"><img loading=\"lazy\" decoding=\"async\" width=\"653\" height=\"641\" src=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/12\/Screenshot-black-beach-road-const-Dec-1st-2023-final-progress-update-for-season.png\" alt=\"\" class=\"wp-image-8449\" srcset=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/12\/Screenshot-black-beach-road-const-Dec-1st-2023-final-progress-update-for-season.png 653w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/12\/Screenshot-black-beach-road-const-Dec-1st-2023-final-progress-update-for-season-300x294.png 300w\" sizes=\"(max-width: 653px) 100vw, 653px\" \/><\/a><\/figure>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-layout-2 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/11\/black-beach-road-const-Nov-2nd-2023-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/11\/black-beach-road-const-Nov-2nd-2023-1024x683.jpg\" alt=\"\" class=\"wp-image-8310\" srcset=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/11\/black-beach-road-const-Nov-2nd-2023-1024x683.jpg 1024w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/11\/black-beach-road-const-Nov-2nd-2023-300x200.jpg 300w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/11\/black-beach-road-const-Nov-2nd-2023-768x512.jpg 768w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/11\/black-beach-road-const-Nov-2nd-2023-1536x1024.jpg 1536w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/11\/black-beach-road-const-Nov-2nd-2023-2048x1365.jpg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Photo credit: Phil Huston Picture taken 11.2.23<\/figcaption><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p><strong><span data-fontsize=\"18px\" style=\"font-size: 18px;\" class=\"vk_inline-font-size\">Update as of November 6, 2023<\/span><\/strong><\/p>\n\n\n\n<p>Contractors have installed the Silt fence on the entire project area.&nbsp; The clearing and grubbing is complete along the existing segment. Pond excavation is approximately 50% complete. &nbsp;MN Power poles have been relocated. A preconstruction meeting was held May 13<sup>th<\/sup>. The activities anticipated for &nbsp;the week of November 6<sup>th<\/sup>&nbsp;include blasting for rock excavation near the south end of the project and storm sewer installation will begin.<\/p>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-layout-3 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/10\/black-beach-road-const-oct-23rd-2023-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/10\/black-beach-road-const-oct-23rd-2023-1024x768.jpg\" alt=\"\" class=\"wp-image-8294\" srcset=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/10\/black-beach-road-const-oct-23rd-2023-1024x768.jpg 1024w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/10\/black-beach-road-const-oct-23rd-2023-300x225.jpg 300w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/10\/black-beach-road-const-oct-23rd-2023-768x576.jpg 768w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/10\/black-beach-road-const-oct-23rd-2023-1536x1152.jpg 1536w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/10\/black-beach-road-const-oct-23rd-2023-2048x1536.jpg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Photo Credit: Phil Huston Progress 10.23.23<\/figcaption><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-large is-resized\"><a href=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/10\/black-beach-road-construction-Oct-28th-2023-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/10\/black-beach-road-construction-Oct-28th-2023-1024x683.jpg\" alt=\"\" class=\"wp-image-8295\" style=\"width:822px;height:548px\" srcset=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/10\/black-beach-road-construction-Oct-28th-2023-1024x683.jpg 1024w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/10\/black-beach-road-construction-Oct-28th-2023-300x200.jpg 300w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/10\/black-beach-road-construction-Oct-28th-2023-768x512.jpg 768w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/10\/black-beach-road-construction-Oct-28th-2023-1536x1024.jpg 1536w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/10\/black-beach-road-construction-Oct-28th-2023-2048x1365.jpg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Photo Credit: Phil Huston  Progress 10.28.23<\/figcaption><\/figure>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-layout-4 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-large is-resized\"><a href=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/11\/black-beach-road-const-progress-photo-4-Nov-14th-2023-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/11\/black-beach-road-const-progress-photo-4-Nov-14th-2023-1024x768.jpg\" alt=\"\" class=\"wp-image-8406\" style=\"width:737px;height:552px\" srcset=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/11\/black-beach-road-const-progress-photo-4-Nov-14th-2023-1024x768.jpg 1024w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/11\/black-beach-road-const-progress-photo-4-Nov-14th-2023-300x225.jpg 300w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/11\/black-beach-road-const-progress-photo-4-Nov-14th-2023-768x576.jpg 768w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/11\/black-beach-road-const-progress-photo-4-Nov-14th-2023-1536x1152.jpg 1536w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/11\/black-beach-road-const-progress-photo-4-Nov-14th-2023-2048x1536.jpg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Photo Credit: Phil Huston  Progress 11.14.23<\/figcaption><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-large is-resized\"><a href=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/11\/Black-Beach-road-const-progress-photo-2-Nov-14th-2023-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/11\/Black-Beach-road-const-progress-photo-2-Nov-14th-2023-1024x768.jpg\" alt=\"\" class=\"wp-image-8405\" style=\"width:739px;height:554px\" srcset=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/11\/Black-Beach-road-const-progress-photo-2-Nov-14th-2023-1024x768.jpg 1024w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/11\/Black-Beach-road-const-progress-photo-2-Nov-14th-2023-300x225.jpg 300w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/11\/Black-Beach-road-const-progress-photo-2-Nov-14th-2023-768x576.jpg 768w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/11\/Black-Beach-road-const-progress-photo-2-Nov-14th-2023-1536x1152.jpg 1536w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/11\/Black-Beach-road-const-progress-photo-2-Nov-14th-2023-2048x1536.jpg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Photo Credit: Phil Huston  Progress 11.14.23<\/figcaption><\/figure>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-layout-5 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/11\/black-beach-road-const-progress-photo-3-Nov-14th-2023-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/11\/black-beach-road-const-progress-photo-3-Nov-14th-2023-1024x768.jpg\" alt=\"\" class=\"wp-image-8404\" srcset=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/11\/black-beach-road-const-progress-photo-3-Nov-14th-2023-1024x768.jpg 1024w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/11\/black-beach-road-const-progress-photo-3-Nov-14th-2023-300x225.jpg 300w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/11\/black-beach-road-const-progress-photo-3-Nov-14th-2023-768x576.jpg 768w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/11\/black-beach-road-const-progress-photo-3-Nov-14th-2023-1536x1152.jpg 1536w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/11\/black-beach-road-const-progress-photo-3-Nov-14th-2023-2048x1536.jpg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Photo Credit: Phil Huston  Progress 11.14.23<\/figcaption><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-large is-resized\"><a href=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/11\/Black-Beach-road-const-main-progress-photo-1-Nov-14th-2023-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/11\/Black-Beach-road-const-main-progress-photo-1-Nov-14th-2023-1024x768.jpg\" alt=\"\" class=\"wp-image-8403\" style=\"width:737px;height:552px\" srcset=\"https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/11\/Black-Beach-road-const-main-progress-photo-1-Nov-14th-2023-1024x768.jpg 1024w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/11\/Black-Beach-road-const-main-progress-photo-1-Nov-14th-2023-300x225.jpg 300w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/11\/Black-Beach-road-const-main-progress-photo-1-Nov-14th-2023-768x576.jpg 768w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/11\/Black-Beach-road-const-main-progress-photo-1-Nov-14th-2023-1536x1152.jpg 1536w, https:\/\/www.silverbay.com\/wp-content\/uploads\/2023\/11\/Black-Beach-road-const-main-progress-photo-1-Nov-14th-2023-2048x1536.jpg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<div class=\"wp-block-media-text alignwide is-stacked-on-mobile\"><figure class=\"wp-block-media-text__media\"><\/figure><div class=\"wp-block-media-text__content\">\n<p><\/p>\n<\/div><\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Project Summary EAST LAKEVIEW DRIVE \u2013THE CITY HAS OBTAINED $1,841,800 IN GRANT FUNDING THROUGH MN DNR STATE PARK ROAD ACCOUNT, MNDOT LOCAL ROAD IMPROVEMENT PROGRAM, AND IRRRB FOR THE NEW ROAD IMPROVEMENTS LEADING TO BLACK BEACH. FINAL ENGINEERING IS NEARING COMPLETION WITH REVIEW BY LAKE COUNTY AND THE STATE OF MN. BIDDING IS EXPECTED TO [&hellip;]<\/p>\n","protected":false},"author":8,"featured_media":0,"parent":7668,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":"","vkexunit_cta_each_option":""},"_links":{"self":[{"href":"https:\/\/www.silverbay.com\/index.php?rest_route=\/wp\/v2\/pages\/7691"}],"collection":[{"href":"https:\/\/www.silverbay.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.silverbay.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.silverbay.com\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.silverbay.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=7691"}],"version-history":[{"count":17,"href":"https:\/\/www.silverbay.com\/index.php?rest_route=\/wp\/v2\/pages\/7691\/revisions"}],"predecessor-version":[{"id":9091,"href":"https:\/\/www.silverbay.com\/index.php?rest_route=\/wp\/v2\/pages\/7691\/revisions\/9091"}],"up":[{"embeddable":true,"href":"https:\/\/www.silverbay.com\/index.php?rest_route=\/wp\/v2\/pages\/7668"}],"wp:attachment":[{"href":"https:\/\/www.silverbay.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=7691"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}